Complex construction of the PV plant
Greenbuddies has undertaken to supply and install a fully operational solar system according to the agreement and local specifics of the region. The implementation involved pile framing, erection of the supporting structure, installation of the PV modules and inverters, DC cabling, connection to the inverters, laying of data cables, earthing, and, of course, project management.
Technical specifications of the PV project
Green energy from the sun will be generated by a total of 11,928 modules with an individual output of 550 Wp, as well as 20 inverters with an output of 250 kVA and 72,160 meters of cabling. A total of 2,800 piles will be used with a south-facing double Mevaco system. The terrain at the site is quite sloping, which made it difficult for the team to work during construction, but they successfully managed it.
Resilience and sustainability
The structure meets the requirements for strength in relation to weight and wind and snow loads, and the attachment of the modules has been dimensioned according to standard wind and snow loads. The installation provides for the possibility of future replacement of the solar modules, i.e., repowering. This project represents another important step towards achieving sustainable development and increasing Sweden's energy self-sufficiency. We are pleased to be part of it.